Case study – geologic risk. design and construction of the sumapaz tunnel
Main Article Content
Abstract
Between years 2006 to 2011, was realized the construction of the tunnel of the Sumapaz, located in the route that leads from Bogota to Girardot, builds singular of the contract of concession of third generation GG-040-2004, celebrated between the National Institute of Routes and the Society Concession freeway Bogotá Girardot S.A. The designs for the structuring of the project the company INGETEC S.A. realized them – BATEMAN INGENIERÍA Ltda. – PIV INGENIERÍA Ltda., establishing the amounts of work to execute, from which 10% of the majors were determined like risk geologic in charge of the concessionaire executed amounts and surpassed this top the recognition by extra charges on the part of the State. The concessionaire in agreement with the contractual power, contracted the nal design of the tunnel with the company PONCE DE LEÓN y CONSULTING ENGINEER ASOCIADOS S.A. – PL&A, with which the work was executed. The State through the National Infrastructure Agency, recognized and paid to the concessionaire the approximated sum of fifty-five billions of additional pesos, despite having counted with the designs of INGETEC and a margin of the ten percent (10%) in the established amounts of work like geologic risk in charge of the concessionaire.
Article Details
Section
DECLARATION OF ORGINIALITY OF SUBMITTED ARTICLE
With this document, I/We certify that the article submitted for possible publication in the institutional journal INGENIO MAGNO of the Research Center Alberto Magno CIIAM of the University Santo Tomás, Tunja campus, is entirely of my(our) own writing, and is a product of my(our) direct intellectual contribution to knowledge.
All data and references to completed publications are duly identified with their respective bibliographical entries and in the citations thus highlighted. If any adjustment or correction is needed, I(we) will contact the journal authorities in advance.
Due to that stated above, I(we) declare that the entirety of the submitted material is in accordance with applicable laws regarding intellectual and industrial property, and therefore, I(we) hold myself(ourselves) responsible for any complaint related to it.
If the submitted article is published, I(we) declare that I(we) fully relinquish publishing rights of the article to the University Santo Tomás, Tunja campus. As remuneration for this relinquishment of rights, I(we) declare my(our) agreement to receive two (2) copies of the edition of the journal in which my(our) article appears.
How to Cite
References
ADUVIRE PATACA, OSVALDO, y Otros. 1997. Manual de túneles y obras subterráneas. Segunda Edición. Madrid mayo de 1997
Colombia, CONPES 376, 2013. Proyectos viales bajo el esquema de Asociaciones Público Privadas: Cuarta Generación de Concesiones Viales.
Colombia, Instituto Nacional de Vías – INVIAS 2015. Manual para el diseño, construcción, operación y mantenimiento de túneles de carreteras. Instituto Nacional de Vías – Primera Edición
Colombia, Instituto Nacional de Vías - INVIAS 2004. Contrato de Concesión No. GG-040 de 1 de julio de 2004.
Consorcio ConCol B&C, 2012. Informes mensuales de interventoría. 2009 a 2012.
Consorcio EDL LTDA – DIS LTDA – IPC LTD, 2009. Informes mensuales de interventoría. 2006 a 2009.
Consorcio INGETEC S.A. – BATEMAN INGENIERÍA LTDA. – PIV INGENIERÍA, 1998. Estudios para la concesión de la carretera Av. Boyacá-Bosa-GranadaGirardot..
SOCIEDAD CONCESIÓN AUTOPISTA BOGOTÁ - GIRARDOT S.A. 2005, Especificaciones, técnicas para construcción. Túnel del Sumapaz
SOCIEDAD CONCESIÓN AUTOPISTA BOGOTÁ GIRARDOT S.A. 2013, Memoria técnica final. Trayecto Túnel Sumapaz. Obras Civiles
TÚNELES DE COLOMBIA S.A. 2009, Informe final de geología y geotecnia WORLD ROAD ASSOCIATION MONDIALE DE LA ROUTE. Manual de túneles de carretera.