Seven Dimensions of a Construction Project with the Building Information Modeling Methodology
Main Article Content
Abstract
Construction projects currently present many errors and setbacks due to a lack of planning and control during the life cycle, so a virtual change beyond the 3d is necessary, with a multidimensional method where the real construction process is imitated by centralizing the information in a single model. The BIM methodology for the management of construction projects is an alternative that allows the reduction of uncertainty In this research a simple model of a one-story house will be developed as a case study, based on the seven dimensions (Idea, Sketch, 3D Visualization, Timing, Cost, Simulation of Energy Behavior and Sustainability and Life Cycle Management of a Construction Project which allows to have less uncertainty and help with decisions regarding the project.
Article Details
Section
How to Cite
References
Erika. (21 de Febrero del 2018). Transformación digital en el sector de la construcción en colombia. Recuperado de http://blogs.autodesk.com/latam/20 18/02/21/transformacion-digital-en-elsector-de-la-construccion-en-colombia/
Menéndez, M. C. (2016). Incorporacion de Metodologia BIM en la Gestion Integrada de Proyectos. Trabajo Fin de Master: españa: laurate international universities. Recuperado de http:// bimchannel.net/wp-content/up loads/ 2017/01/201701_TFM_MargaritaCárdenas.pdf
Succar, B., Sher, W., & Williams, A. (2013). An integrated approach to BIM competency assessment, acquisition and application. Automation in Construction, 35, 174–189. https:// www.sciencedirect.com/science/article/ pii/S0926580513000836
Ocampo, J. G. (2015). La Gerencia Bim Como Sistema Bim As the Management System. Revista Gerencia Tecnológica Informática, 14(38), 17–29. Recuperado de http://revistas.uis.edu.co/index.php/ revistagti/article/view/4868/5668
Lu, Y., Wu, Z., Chang, R., & Li, Y. (2017). Building Information Modeling (BIM) for green buildings: A critical review and future directions. Revista Automation in Construction, 83(August), 134–148. https://www.sciencedirect.com/science/ article/pii/S092658051730095X
Wong, J. K. W., & Zhou, J. (2015). Enhancing environmental sustainability over building life cycles through green BIM. Revista Automation in Construc tion, 57, 156–165. http://hdl.handle. net/10397/17663
Nshassi, A., & AbuHamra, L. (2016). An investigation of building information modelling functions in the Palestinian construction industry. Revista Ingenieria De Construccion, 31(2), 127–138.
Lopez Filed, F. (2017). Ilustración eadic formación y consultoría. [Figura]. Recuperado de http://www.eadic.com/ ingenieria/ arquitectura /
Gonzalez, R., (junio,2016) Retos de la adopción de BIM en los proyectos de Infraestructura lineal: El reto de implementar BIM en proyectos de infraestructura .En E. Juan Antonio Santamera (presidente) jornada llevada a cabo en I jornada BIM colegio de caminos, canales y puertos jornada BIM el futuro de las infraestructuras, Madrid España.
Chu, M., Matthews, J., & Love, P. E. D. (2018). Integrating mobile Building Information Modelling and Augmented Reality systems: An experimental study. Revista Automation in Construction, 85(October 2017), 305–316. https:// www.sciencedirect.com/science/article/ pii/S0926580517301218
Drury, B., Bazjanac, V., & Crawley, D. B. (1997). The Implementation of Industry Foundation Classes in Simulation Tools for the Building Industry. University of California. Recuperado de https://escholarship.org/uc/item/76c6z6g4
Building SMART International home of openBim. (2017). IFC Introduction. Recuperado de https://www.Building smart.org/about/what-is-openbim/ifc -introduction/
Dlubal Software. (2018). Planificación eficiente con BIM). Recuperado de https://www.dlubal.com/es/soluciones/ areas-de-aplicacion/planificacion-orientada-a-bim/ que-es-el-bim
Ding, L., Li, K., Zhou, Y., & Love, P. E. D. (2017). An IFC-inspection process model for infrastructure projects: Enabling real-time quality monitoring and control. Revista Automation in Construction, 84(April), 96–110. https://www.sciencedirect.com/science/article/pii/ S0926580517303783
Vanlande, R., Nicolle, C., & Cruz, C. (2008). IFC and building lifecycle management. Revista Automation in Construction, 18(1), 70–78. https:// www.sciencedirect.com/science/ article/pii/S0926580508000800
García Fernández, M. (2017, Junio de 20176). Dimensiones BIM e l alcance del programa. Recuperado de https:// online.revitalacarta.com/2017/06/06/ dimensiones-bim-alcance-del-programa/
Sánchez Ortega, A. (2016, Diciembre, 9). Blanca –BIM y las 7 dimensiones. Recuperado de https://www.espaciobim.com/bim-3d-4d-5d-6d-7d/
Hildebrandt Gruppe. (2016). Profundidad de las dimensiones BIM en proyectos de alta complejidad. Recuperado de http:// www.hildebrandt.cl/dimensiones-bimproyectos-de-alta-complejidad/
Candelario-Garrido, A., García-SanzCalcedo, J., & Reyes Rodríguez, A. M. (2017). A quantitative analysis on the feasibility of 4D Planning Graphic Systems versus Conventional Systems in building projects. Revista Sustainable Cities and Society, 35(August), 378–384. C.Recuperado de https://www.science direct.com/science/article/pii/S22106 70717301312
Smith, P. (2014). BIM & the 5D Project Cost Manager. Revista Procedia - Social and Behavioral Sciences, 119, 475–484. Recuperado de https://www. sciencedirect.com/science/article/pii/ S1877042814021442
Smith, P. (2016). Project Cost Management with 5D BIM. Revista Procedia - Social and Behavioral Sciences, 226(October 2015), 193–200. Recuperado de https://www.science direct.com/science/article/pii/S18770428 16308655
Nicał, A. K., & Wodyński, W. (2016). Enhancing Facility Management through BIM 6D. Revista Procedia Engineering, 164(June), 299–306. Recuperado de https://www.sciencedirect.com/science/article/ pii/S1877705816339649